Buy Avada

Voltage Optimisation Case Study :
The Jockey Club

The Jockey Club is the largest commercial horse racing organisation in the United Kingdom. It owns 15 of Britain’s famous racecourses, including Aintree, Cheltenham,

Epsom Downs and both the Rowley Mile and July Course in Newmarket. They aim to become carbon neutral for 2027 and are working hard to significantly reduce their carbon emissions.

To help on this journey Powerhub are working with The Jockey Club across sites nationwide to install our Voltage Optimisation technology that enables their estate to run more efficiently by reducing kilowatt consumption, whilst still maximising equipment usage.

571,590.00 kWh

Annual kWh Savings across 30 units

118,361.43kg

Annual Carbon Savings across 30 units

ROI: 26 MONTHS30 Voltage optimisation units across 13 sites

Key Benefits

• Guaranteed savings
• Lower energy consumption
• Lower carbon emissions
• Protection of appliances
• Lower maintenance costs
• Higher efficiency
• Improves Solar and Wind Generation
• Removal of penalties

85%

Product Quality Index

92%

Energy Generation

The Jockey Club’s Commitment To Sustainability:

“CUTTING OUR CARBON EMISSIONS AND INVESTING IN RENEWABLES”

We announced our commitment to Carbon Neutral for 2027 and are working hard with our colleagues to significantly reduce our emissions as well as improving the biodiversity across our racecourses and training grounds.

We not only want to reduce the energy we use but ensure that the energy we do use comes from clean and sustainable sources. In 2017 our solar panels at Exeter produced enough electricity to power 15 homes for a year. And was just the start! We have since installed further solar at Newmarket, Cheltenham and Haydock Park racecourses and at the National Stud.

We won’t stop here. There are lots of exciting plans in the pipeline and we will continue to make sure we continue to cut our impact.

More Info